解析停车场环氧地坪漆的工艺简单又高效原因

发表日期:2018-11-13 14:47:47浏览次数:26 标签:无锡网络公司 无锡百度包年 无锡百度优化 环氧地坪 

停车场环氧地坪漆的工艺流程:一、涂装方案设计在了解了基材状况、环氧地坪使用要求后,需要对环氧地坪工程进行涂装方案设计.内容包括: 1、表面处理方式:即针对现实存在的其材状况,采用什么样的表面处理方式2、涂层厚度,包括总涂层厚度及各道涂层的厚度设计;3、宜选用的停车场环氧地坪漆涂料及辅料品种,包括底漆、中涂层、面漆等,还有各种粒径的石英砂、稀释剂、清洗剂等辅料; 4、各道涂层或工序的施工方法; 5、进行各道工序施工需要的设备、工具及耗材等的配置; 6、施工人员及施工进度安排等。 7、施工过程中的质量控制和检测手段; 8、环氧树脂砂浆滚涂地坪顺序如下: a.基面打磨除尘处理。 b.涂刷环氧树脂封闭底漆。 c.批刮环氧树脂砂浆地坪漆。 d.批刮环氧树脂地坪腻子。 e.涂刷环氧树脂面漆。 f.涂刷环氧面漆或清漆。

The process flow of parking lot floor paint: 1. After knowing the condition of base material and the requirement of epoxy floor, it is necessary to design the coating scheme for epoxy floor project. The contents include: 1. Surface treatment method: which surface treatment method should be adopted according to the actual material condition; 2. Coating thickness. Degree, including the total coating thickness and the thickness design of each coating; 3. The suitable types of parking floor paint and accessories, including primer, intermediate coating, topcoat, and other accessories, as well as quartz sand, diluent, cleaning agent of various sizes; 4. The construction methods of each coating or process; 5. The construction needs of each process. Configuration of equipment, tools and consumables; 6. Construction personnel and construction schedule. 7. Quality control and testing methods in construction process. 8. The sequence of roll-coating floor with epoxy resin mortar is as follows: a. Base surface grinding and dust removal treatment. B. brushing epoxy resin seal primer. C. batch of epoxy resin mortar floor paint. D. batch scraping epoxy floor putty. E. brushing epoxy resin finish. F. coat epoxy varnish or varnish.

? 二、素地处理是环氧地坪施工

Two, prime land treatment is epoxy floor construction.

??混凝土地面,表面处理及素地缺陷修复 1、 混凝土素地质量评估 混凝土素地浇铸质量是地坪质量的基础,一般要求是看上去平整、坚实、不易起沙、敲击时声音清脆,一般磨刮不轻易留深痕,表面上下一致,无明显松散,用小锤敲击,无空壳声,表面检查,无较大面积裂缝,无龟裂现象,即可判为基本合格。 基层检查包括混凝土含水率的测定、平整度的测定、强度的测定。

_Concrete ground, surface treatment and repair of defects in plain ground 1. Evaluation of plain ground casting quality of concrete is the basis of the quality of the ground. Generally, it is required to look flat, firm, not easy to sand, and sound when knocking is clear. Generally, it is not easy to leave deep marks when scraping, and it is consistent on the surface, without obvious looseness. With hammer knocking, no shell sound, surface inspection, no large area cracks, no cracking phenomenon, can be judged to be basically qualified. The basic level inspection includes the determination of the moisture content of concrete, the measurement of evenness and the determination of strength.

? 三、停车场地坪漆的注意事项及选择方法

Note three, matters needing attention and selection methods for parking floor paint

??(一)、 混凝土强度必须≥C25.含350kg/m3以上的普通硅酸盐。 水泥及水灰比 (二)、 找平层必须是细石混凝土及其厚度不可少于50mm。

(1) the strength of concrete must be equal to more than C25. of ordinary silicate containing more than 350kg/m3. Cement and water cement ratio (two), leveling layer must be fine aggregate concrete and its thickness can not be less than 50mm. 


如没特殊注明,文章均为本站原创,转载请注明来自http://www.esw.net.cn/news/151.html

评论

  • 管理员刚刚

    暂无任何留言!

相关新闻

广告发布或者企业软件服务

亿联网是昆山亿思互联信息科技有限公司为企业提供的专业网站建设、推广、运营…

日期:2016-08-29 浏览次数:22

生物质热风炉的运转要严厉依照…

燃气壁挂热风炉构造方式有三有些构成焚烧设备、换热设备、自动控制和安全保护…

日期:2018-12-06 浏览次数:26

环氧地坪施工前对素地面的要求…

环氧地坪施工质量好坏关切到施工人员的技术,技术的好坏在从施工效果就可以看…

日期:2018-10-24 浏览次数:25

我们认真处理每一个细节,是因…

亿联网是昆山亿思互联信息科技有限公司为企业提供的专业网站建设、推广、运营…

日期:2016-08-29 浏览次数:18

燃气热风炉安装过程中需注意事…

热风炉基础的确定应根据当地土质,参考厂家提供的基础图由土建部门重新设计。…

日期:2018-12-11 浏览次数:50

环氧地坪工程完工后异味该如何…

在施工完环氧地坪漆后,会残留着有一股难闻的刺鼻气味,相必大家已经是早有耳…

日期:2018-11-01 浏览次数:11